NSBAIDRD ~ Nevada State Board of Architecture, Interior Design and Residential Design
PUBLIC WORKS PROJECTS AWARDED  |
 
  
 

Date

Company

Agency Name

Project

Preference

04/27/2017

The Dube Group, Architect

Washoe County School District

Door Hardware Replacement Upgrade

No

Description: Silver Lake – professional engineering services for design of door hardware replacement for exterior doors and interior cores

 

 

Date

Company

Agency Name

Project

Preference

04/27/2017

GML Architects, LLC

Washoe County School District

DRS Addition Construction

No

Description: Damonte Ranch HS expansion – bidding phase includes: architectural, civil, structural, mechanical, and electrical – administration phase that includes: architectural, civil, structural, mechanical, and electrical – reimbursable expense budget

 

Date

Company

Agency Name

Project

Preference

04/20/2017

Frame Architecture Incorporated

Washoe County School District

Bond Admin

No

Description: Capital Projects – proposal to revise three existing open office spaces in rooms 6,7,& 8 – rooms 6 & 7 are to have two new private offices, each with the remaining open space , and room 8 to have another office and in-fill an adjacent door

 

Date

Company

Agency Name

Project

Preference

04/11/2017

Cuningham Group Architecture, Inc.

Washoe County School District

Ed Specs Updates

No

Description: High School Educational Specifications – develop education specifications that define the general characteristics; relationships; square footage requirements; amenities; site amenities; furniture, furnishings, and related equipment; and building systems performance for criteria – estimated 2,400 student high school located throughout the district

 

Date

Company

Agency Name

Project

Preference

03/22/2017

Hershenow and Klippenstein Architects, Inc

Washoe County School District

Bella Vista Design

No

Description: Sun Valley MS – Architectural/Engineering design services for the new  South Meadows Elementary School

 

Date

Company

Agency Name

Project

Preference

03/22/2017

Van Woert Bigotti Architects, a Professional Corporation

Washoe County School District

Spanish Springs MS Design

No

Description: Spanish Springs MS Design – Architectural/Engineering design services for the new Spanish Springs MS

 

Date

Company

Agency Name

Project

Preference

03/22/2017

Van Woert Bigotti Architects, a Professional Corporation

Washoe County School District

Sun Valley Design

No

Description: Sun Valley MS – Architectural/Engineering design services for the new Sun Valley Area Middle School

 

Date

Company

Agency Name

Project

Preference

03/07/2017

PDG Architecture Corp, Nevada

Washoe County School District

Damonte Ranch Addition Construction

No

Description: Damonte Ranch HS – Construction project management and inspection services


Date

Company

Agency Name

Project

Preference

02/28/2017

Collaborative Design Studio

Washoe County School District

Board Room Upgrades

No

Description: design boardroom upgrade plans that include Fire Marshall corrections, AV designs, casework, and furniture layout

 

Date

Company

Agency Name

Project

Preference

02/07/2017

J.R. Romero, Architect

Washoe County School District

Safety - Attic Access Projects

No

Description: Allen ES, Bennett ES, & Alice Smith ES - attic access projects - architect construction administration services



Date

Company

Agency Name

Project

Preference

02/07/2017

J.R. Romero, Architect

Washoe County School District

Carpentry – FCIS Repairs – Attic Access

No

Description: Caughlin Ranch ES, Desert Heights ES, & Huffaker ES – extra services inserting updated MDPs into sheets - making new permit drawings

 

Date

Company

Agency Name

Project

Preference

02/07/2017

J.R. Romero, Architect

Washoe County School District

Fund 40 Scheduled Scheduled Projects

No

Description: Caughlin Ranch ES & Desert Heights ES – attic access projects – architect construction administration services

 

Date

Company

Agency Name

Project

Preference

12/23/2016

Cuningham Group Architecture, Inc.

Washoe County School District

Educational Specifications

No

Description: District – provide all services per proposal dated 04/25/2016 as approved by WCSD BOT 05/24/2016

 

Date

Company

Agency Name

Project

Preference

12/22/2016

Architects + LLC

Washoe County School District

Remodels - Overcrowding

No

Description: Loder – professional architectural and engineering services for the purpose of converting the original boiler room into a new classroom

 

Date

Company

Agency Name

Project

Preference

12/22/16

Tate Snyder Kimsey Architects

Washoe County School District

Elementary School Revitalization

No

Description: Natchez ES – elementary school revitalization

 

Date

Company

Agency Name

Project

Preference

12/22/2016

The Dube Group, Architect

Washoe County School District

Door Hardware Replacement/Upgrade

No

Description: Reno HS – professional services for base drawings and develop bid documents for installation of new locks and cylinders to district standard

 

Date

Company

Agency Name

Project

Preference

12/22/16

Architects + LLC

Washoe County School District

Elementary School Revitalization

No

Description: Picollo School – school revitaliztion

 

Date

Company

Agency Name

Project

Preference

12/13/2016

J. R. Romero, Architect

Washoe County School District

Carpentry – FCIS Repairs

No

Description: Dilworth MS, Sparks MS, and Traner MS – attic access improvements – extra services to add access ladders/Donner Springs ES and Double Diamond ES – attic access improvements – extra services to insert updated MDPs to drawings

 

Date

Company

Agency Name

Project

Preference

11/21/2016

Stantec Architecture, Inc.

City of Las Vegas

Gilmore – Cliff Shadows Park

No

Description: design of seven acre site with shaded tot lot, swing set, restroom, water play area, group shelter, 4 ramadas, turf area, walkaways, and parking in Las Vegas, NV

 

 

Date

Company

Agency Name

Project

Preference

11/21/2016

Anne Johnson, AIA

City of Henderson

Henderson Pavilion Monument Sign

No

Description: New LED monument sign for the Henderson Pavillion

 

 

Date

Company

Agency Name

Project

Preference

11/16/2016

PDG Architecture Corp, Nevada

Washoe County School District

Paving

No

Description: pavement management training and reporting including verifications for various schools – project development for 2017 EUL program

 

 

Date

Company

Agency Name

Project

Preference

10/24/16

KGA Architecture

City of Las Vegas
Medical District Parking Garage

No

Description: design bid built project of 750 parking spaces in Las Vegas, Nevada

 

 

Date

Company

Agency Name

Project

Preference

10/24/16

Aptus Architecure

City of Las Vegas

DSC 3rd Floor Remodel

No

Description: remodel on 3rd floor of the Development Services Center in Las Vegas, Nevada

 
  

Date

Company

Agency Name

Project

Preference

10/17/16

Hershenow & Klippenstein Architects, Inc.

City of Sparks

Sparks Municipal Court Security Entrance Remodel

No

Description: remodel the existing entrance to the municipal court to include the security screening arena, foyer, and lobby

 

Date

Company

Agency Name

Project

Preference

10/10/16

Paul Cavin Architect LLC

Douglas County Public Works

Lake Tahoe Administration Building HVAC Upgrades

No

Description: professional design services for building HVAC replacement

 

 

Date

Company

Agency Name

Project

Preference

10/04/16

Architects + LLC

Washoe County School District

Educational Options

No

Description: Washoe Inspire – construction administration

 

 

Date

Company

Agency Name

Project

Preference

09/26/16

GML Architects, LLC

Washoe County School District
2017 ADA Compliance

No

Description:  Galena HS - design plans for accessibility improvements for ADA

 

 

Date

Company

Agency Name

Project

  

09/26/16

GML Architects, LLC

Washoe County School District

2017 ADA Compliance

No

Description:  Incline HS - design plans for accessibility improvements for ADA


Date

Company

Agency Name

Project

Preference

09/22/16

Novus Architecture LLC
City of Las Vegas
Lieburn Senior Center Additional Room

No

Description:  enclosure of an existing patio area into additional room for programs at 623 Garwood Avenue in Las Vegas, NV


Date

Company

Agency Name

Project

Preference

09/20/16

The Dube Group, Architect

Washoe County School District

Door Hardware/Replacement Upgrades

No

Description:  Taylor, Reno, Spanish Springs ES, Van Gorder, McQueen, Westergard, Winnemucca, Damonte Ranch - professional services for base drawings, conduct field investigations, and develop bid documents for installation of new locks and cylinders to district standard

 

Date

Company

Agency Name

Project

Preference

08/30/16

Hooft Architecuture LLC

Washoe County School District

Asbestos Abatement Projects

No

Description:  thermal system insulation (TSI) abatement in the following elementary schools:  J Duncan, Cannan, Risley, Maxwell, Palmer, Drake, Whitehead, Diedrichsen, Van Gorder, Natchez, Anderson, Loder, Veterans, Booth, Smithridge, Corbett, Hunter, Elmcrest, Peavine, Lenz, Pleasant Valley, Lemmon, Stead, Gomes

 
 
 

Date

Company

Agency Name

Project

Preference

08/30/16

Hershenow and Klippenstein Architects, Inc

Washoe County School District

Signature Academy


No

Description: Sparks HS - professional archtitectural design for the Sparks HS Robotics Lab

 

Date

Company

Agency Name

Project

Preference

08/30/16

GML Architects - LLC

Washoe County School District

Flooring - FCIS Repairs


No

Description: Hug HS  -four rooms in gym & four rooms in building A; McQueen - room #L1; Sparks HS - nurse's office

 

Date

Company

Agency Name

Project

Preference

08/25/16

Gary Guy Wilson Architect Studios

City of Las Vegas

Fire Station 103


No

Description: remodel of the fire station at Upland and Jones in Las Vegas, NV

 

Date

Company

Agency Name

Project

Preference

08/23/16

Carpenter SellersDel Gatto Architects

City of Henderson

Emergency Operations Center (EOC)

No

Description:  renovate an existing 5,000 sq ft data center in the basement of City Hall for a new EOC facility - renovations to consist of interior renovations and upgrades, new HVAC system, security enhancements, AV/communication, electrical and lighting systems, equipment/furnishings

 
Date Company Agency Name 
Project 
Preference 
08/10/16
Van Woert Bigotti Architects, a Professional Corporation Washoe County School District
School Site Planning 

 No
Description: plan study for future Sun Valley area middle school and future Arrow Creek area middle school per proposal dated June 27, 2016
 
 

Date

Company

Agency Name

Project

Preference

08/10/16 Hershenow and Klippenstein Architects, Inc

Washoe County School District

School Site Planning


No

Description: future study for Corona Cyan, Rio Wrangler, future Harris Ranch area elementary schools per proposal dated June 21, 2016.

 

Date

Company

Agency Name

Project

Preference

07/20/16

TSK
Washoe County School District
Painting - FCIS Repairs


No

Description: Mt. Rose ES & Stead ES - exterior painting project


Date

Company

Agency Name

Project

Preference

07/11/16

J. R. Romero,Architect

Washoe County School District

Carpentry - FCIS Repairs


No

Description: Hunsberger ES, Mathews ES, Melton ES, Moss ES - attic improvements

 

Date

Company

Agency Name

Project

Preference

07/11/16

Collaborative Design Studio

Washoe County School District

Carpentry - FCIS repairs


No

Description: Hug HS - boys gym lockers replacement project

 

Date

Company

Agency Name

Project

Preference

07/07/16

J. R. Romero, Architect

Washoe County School District

Mobiles FCIS Repair 2017 Bond Allocation


No

Description: Loder - portable #602 exterior siding & skirting project; Sparks HS - portable #609 exterior siding & skirting project; Van Gorder - portable #608 exterior siding and skirting project

 

Date

Company

Agency Name

Project

Preference

07/07/16

The Dube Group, Architect

Washoe County School District

Projects Under 25K


No

Description: Sun Valley - professional services for base drawings, conduct field investigations, and develop bid documents for installation of new locks and cylinders to district standard.


Date

Company

Agency Name

Project

Preference

07/07/16

The Dube Group, Architect

Washoe County School District

Projects Under 25K


No

Description: AACT - professional services for base drawings, conduct field investigations, and develop bid documents for installation of new locks and cylinders to district standard.

 

Date

Company

Agency Name

Project

Preference

07/06/16
GML Architects
Washoe County School District
Remodels -overcrowding


No

Description: Damonte Ranch HS - professional design services for school additions

 

Date

Company

Agency Name

Project

Preference

06/29/16

Van Woert Bigotti Architects, a Professional Corporation Washoe County School District
Ed Specs Updates


No

Description: Districtwide - ed specs updates, costs for architect's involvement in ed specs updates per proposal dated 06/27/2016

 

Date

Company

Agency Name

Project

Preference

06/29/16

Hershenow and Klippenstein Architects, Inc

Washoe County School District

Ed Specs Update


No

Description: Districtwide - ed specs updates, costs for architect's involvement in ed specs updates per proposal dated 06/27/2016

 

Date

Company

Agency Name

Project

Preference

06/10/16

Bull Stockwell & Allen Architects, A California Corporation

Incline Village PID, Public Works Division

Incline Village Beach House Project


No

Description: architectural and engineering design services for the design of the Incline Beach House

 

Date

Company

Agency Name

Project

Preference

06/02/16

PDG Architecture Corp, Nevada

Washoe County School District

Project Management


No

Description: HA - Incline door and door hardware

 

Date

Company

Agency Name

Project

Preference

06/02/16

PDG Architecture Corp, Nevada

Washoe County School District

Project Management


No

Description: Incline MS - project control services for Incline MS exterior paint and seal

 

Date

Company

Agency Name

Project

Preference

06/02/16

PDG Architecture Corp, Nevada

Washoe County School District

Project Management


No

Description: Incline MS - project control services for Incline MS IT MDF HVAC

 

Date

Company

Agency Name

Project

Preference

6/1/16

The Dube Group, Architect

Washoe County School District

Door Hardware Replacement Upgrade


No

Description: Diedrichsen Elementary - professional engineering services for design of hardware replacement for classroom doors only

 

Date

Company

Agency Name

Project

Preference

05/31/16

The Dube Group, Architect

Washoe County School District

Door Hardware Replacement Upgrade


No

Description: Dodson ES - professional engineering services for design of door hardware replacement for classroom doors only

 

Date

Company

Agency Name

Project

Preference

05/31/16

The Dube Grouup, Architect

Washoe County School District

Door Hardware Replacement Upgrade


No

Description: Spanish Springs HS - professional engineering services for design of door hardware replacement for classroom doors only

 

Date

Company

Agency Name

Project

Preference

05/25/16

PDG Architecture Corp, Nevada

Washoe County School Distirct

60455 Ed Specs Updates


No

Description: districtwide - ed specs update - provide scheduling services for ed specs and all other tasks for ES, MS, & HS for 9 year program per proposal

 

Date

Company

Agency Name

Project

Preference

05/25/16

Hooft Architecture, LLC

Truckee Meadows Water Authority

Chalk Bluff Control Room, HVAC Replacement and Roofing Project   


No

Description: design services for the control room update, HVAC replacement, and roofing project at the Chalk Bluff WTP

 

Date

Company

Agency Name

Project

Preference

05/16/16
Collaborative Design Studio

Washoe County School District

Administration Board Room/AV Media Feasibility Study


No

Description: administration building - professional architectural design services for administration board room AV/media feasibility study

 

Date

Company

Agency Name

Project

Preference

05/04/16

Hershenow and Klippenstein Architects, Inc

Washoe County School District

Signature Acacemy


No

Description: Sparks HS - professional architectural design for the Sparks Mechatronics Lab

 

Date

Company

Agency Name

Project

Preference

05/03/16

GML Architects LLC

Washoe County School District
Galena Greenhouse Signature Design


No

Description: Galena HS-professional architectural construction administrative services for Galena greenhouse and classroom remodel

 

Date

Company

Agency Name

Project

Preference

04/28/16

GML Architects LLC

Washoe County
School District

Signature Acadamies


No

Description: North Valley HS - construction administrative services - includes construction meetings, substantial completion inspection, and final project description

 

Date

Company

Agency Name

Project

Preference

04/26/16

GML Architects LLC
Washoe County School Distrct
Nutritional Services


No

Description: additonal construction services required on project PO416822 - was closed before the services were required

 

Date

Company

Agency Name

Project

Preference

03/29/16

GML Architects LLC

Washoe County School District

Signature Academy


No

Description: Galena HS-professional architectural design services for computer lab and classrooms


Date

Company

Agency Name

Project

Preference

03/29/16

GML Architects LLC

Washoe County School District

ADA Restroom Modifications


No

Description: McQueen HS & Glenn Hare Center-construction document preparation for the ADA toilet room and ADA signage improvements

 

Date

Company

Agency Name

Project

Preference

03/28/16

Hershenow and Klippenstein Architects, Inc

Truckee Meadows Water Authority

TMWA Corporate Office Expansion


No

Description: architectural services for the corporate office expansion

 

Date

Company

Agency Name

Project

Preference

03/22/16

Architects + LLC

Washoe County School District

OSP Driven Projects


No

Description: Inspire-Washoe HS East - provide architectural services for providing design and construction documents for the remodel of the existing Inspire-Washoe HS East Facility

 

Date

Company

Agency Name

Project

Preference

03/01/16

Hershenow and Klippenstein Architects, Inc

Truckee Meadows Water Authority

TMWA Operations Facility Ready Room Remodel


No

Description: architectural services for the remodel of existing space at TMWA corporate office

 

Date

Company

Agency Name

Project

Preference

02/22/16

The Dube Group, Architect

Washoe County School District

Door Hardware Replacement Upgrade


No

Description: Washoe West Innovations - professional engineering services for design of door hardware replacement for classroom doors only

 

Date

Company

Agency Name

Project

Preference

02/22/2016

The Dube Group, Architect

Washoe County School District

Door Hardware Replacement Upgrade


No

Description: Whitehead - professional engineering services for design of door hardware replacement for classroom doors only

 

Date

Company

Agency Name

Project

Preference

02/22/16

The Dube Group, Architect

Washoe County School District

Door Hardware Replacement Upgrad


No

Description: North Valleys HS - professional engineering services for design of door hardware replacement for classroom doors only

 

Date

Company

Agency Name

Project

Preference

02/22/16

Hershenow and Klippenstein Architects, Inc

Washoe County School District

Signature Academy


No

Description: Spanish Springs HS - architectural and engineering services for a new wall and glass partition at Spanish Springs HS Signature Academy

 

Date

Company

Agency Name

Project

Preference

02/18/16

GML Architects LLC

Washoe County School District

Signature Academy


No

Description: Galena HS - Professional Architectural Design Services for Galena HS Greenhouse Facility Renovation

 
Date
Company Agency Name
Project
Preference
02/17/16
H & K Architects
Washoe County School District
Signature Academy

No
Description: Reno HS - professional architectural design services for Reno HS Red House Facility Acoustical Sound Baffle Project
 
Date
Company Agency Name
Project
Preference
02/12/16
PDG Architecture Corp, Nevada
Washoe County School District
Paving

No
Description: district-wide pavement management system implementation (MicroPAVER) as proposed
 
Date
Company Agency Name 
Project 
Preference
02/11/16
JMA Architects, Inc.
City of Las Vegas
Department of Planning Full Circle Office Renovation of the DSC 3rd Floor

No
Description: design of new office space for the Department of Planning in Las Vegas, NV
 
Date
Company Agency Name 
Project 
Preference
02/09/16
Dube Group Architecture
City of Sparks
City of Sparks City Hall Finance IT Restroom Renovation

No
Description: remodel existing restrooms of finance/IT area to be ADA accessible 
 
Date
Company Agency Name
Project
Preference
02/02/16
Pugsley Simpson Coulter
LVCVA
Restroom #109 Upgrade

No
Description: architectural and interior design of restroom #109 upgrade
 
Date
Company Agency Name
Project
Preference
01/27/16
Hershenow & Klippenstein
Washoe County School District
Fund 40 - Scheduled Projects

No
Description: new LP station at North Valleys Transportation Center -  proposal for architectural and engineering design services to revise A&E drawings to coordinate with City of Reno municipal code for LP tank location and screening

Date
Company Agency Name
Project
Preference
01/26/16
PGAL
City of Las Vegas
Medical District Bus Shelters Prototype

No
Description: design of bus shelters to be located within the Medical District in Las Vegas, Nevada
 
 
Date
Company Agency Name
Project
Preference
01/26/16
H&K Architects
Truckee Meadows Water Authority
D'Andrea #3 Pump Station

No
Description: architectural services for new pump station being built
 
 
Date
Company Agency Name
Project
Preference
01/06/16
H&K Architects
Washoe County School District
Fund 40 - Scheduled Projects

No
Description: Reno HS - scheduled projects - provide design & engineering services for WCSD Welding Shop per proposal dated 12-08-15
 
Date
Company Agency Name
Project
Preference
12/28/15
The Louis Berger Group, Inc
Clark County Public Works
Lower Flamingo Detention Basin Trash Rack Design


No
Description:  professional engineering design services of a trash rack for an existing Lower Flamingo Detention Basin located in the northwest
 
Date
Company Agency Name
Project
Preference
11/24/15
JR Romero Architect
Washoe County School District
Scheduled Projects Attic Access & Catwalks

No
Description: various schools-architectural services to prepare bidding documents for attic access and catwalk improvements to elementary and middle schools
 
Date
Company Agency Name
Project
Preference
11/23/15
GML Architects
Washoe County School District
2016 Flooring - FCIS Repairs


No
Description: Hug HS - building b's flooring replacement project - VAT replaced in corridors and offices with heavy duty resilient tile floors
 
 
Date
Company Agency Name
Project
Preference
11/23/15
Architects + LLC
Washoe County School District
Windows

No
Description: Incline HS - architectural services to provide design documents for bidding and construction services for the window replacement project
 
 
Date
Company Agency Name
Project
Preference
11/18/15
H+K Architects
Truckee Meadows Water Authority
TMWA Corporate Expansion Options


No
Description: architectural services to explore TMWA's corporate expansion options
 
Date
Company Agency Name
Project
Preference
11/09/2015
TSK
Washoe County School District
Painting - Miscellaneous FCIS Projects

No
Description: Mt. Rose ES - stucco repair
 
Date
Company Agency Name
Project
Preference
11/09/2015
Architects + LLC
Washoe County School District
Window Replacement

No
Description:  Clayton MS - design and specifications for window replacement project
 
Date
Company Agency Name
Project
Preference
11/09/2015
TSK
Washoe County School District
Painting - Miscellaneous FCIS Projects

No
Description: Pine MS - painting project
 
Date
Company Agency Name
Project
Preference
09/25/15
Hooft Architecture, LLC
Washoe County School District
Carpentry - FCIS Repairs

No
Description: Vaughn MS - fire door replacement
 
 
Date
Company Agency Name
Project
Preference
09/25/15
Hooft Architecture, LLC
Washoe County School District

Carpentry - FCIS Repairs


No
Description:  Picollo - beam tail restoration project

 
Date
Company Agency Name
Project
Preference
09/10/15
The Dube Group Architect
Washoe County School District
Door Hardware Replacement Upgrade

No
Description:  Desert Heights ES - professional engineering services for design of door hardware replacement for classroom doors only
 
 
Date
Company Agency Name
Project
Preference
09/10/15
GML Architects LLC
Washoe County School District
ADA Restroom Modifications

No
Description:  McQueen HS & Glenn Hare Center - provide design approach plan to modify toilet rooms
 
Date
Company Agency Name
Project
Preference
09/10/15
JR Romero Architect
Washoe County School District
Window Replacement

No
Description:  Washoe Innovations - construction administration services plus any reimbursable expenses incurred for the permit/bidding
 
Date
Company Agency Name
Project
Preference
09/10/15
JR Romero Architect
Washoe County School District
Mobiles - FCIS Repair Project

No
Description:  Reed HS - portable #607 and portable #617 - exterior siding and skirting replacement - architectural services
 
Date
Company Agency Name
Project
Preference
09/10/15
JR Romero Architect
Washoe County School District
Carpentry - FCIS Projects

No
Description:  Anderson ES - exterior soffit replacement - architectural design services

Date
Company Agency Name
Project
Preference
09/10/15
Hooft Architecture, LLC
Washoe County School District
Painting - FCIS Repairs

No
Description:  Incline MS - architectural services to prepare, seal, and repaint exterior wood siding
 

Date
Company Agency Name
Project
Preference
09/10/15
The Dube Group Architect
Washoe County School District
Door Hardware Replacement Upgrade

No
Description:  Incline HS - professional engineering services for design of door hardware replacement for the entire school
 
 
Date
Company Agency Name
Project
Preference
09/10/15
The Dube Group Architect
Washoe County School District
Door Hardware Replacement Upgrade

No
Description:  Alice Smith ES - professional engineering services for design of door hardware replacement for classroom doors only
 
 
Date
Company Agency Name
Project
Preference
09/10/15
The Dube Group Architect
Washoe County School District
Door Hardware Replacement Upgrade

No
Description:  Galena HS-Professional engineering services for design of door hardware replacement for the entire school
 
 
Date
Company Agency Name
Project
Preference
09/10/15
The Dube Group Architect       
Washoe County School District
Door Hardware Replacement Upgrade

No
Description:  Donner Springs ES-Professional engineering services for design of door hardware replacement for classroom doors only
 
 
Date
Company Agency Name
Project
Preference
09/09/15
Architects + LLC
Washoe County School District
Window Replacement

No
Description:  Washoe Innovations - construction administration services plus any reimbursable expenses incurred for the permit/bidding
 
 
 
Date
Company Agency Name
Project
Preference
09/09/2015
JR Romero Architect
Washoe County School District
Mobiles FCIS Repair Projecte

No
Description:  Mitchell ES-Portable #632 - exterior siding & skirting replacement architectural design services
 
 
 
Date
Company Agency Name
Project
Preference
 09/01/15
Tate Snyder Kimsey Architects
Board of Regents of the School of Medicine
RFQ 638-DC Program, Plan, Architectural, Engineering and Design Consulting Services

No
Description:  schematic design/space planning, design development, construction documents, bidding/permitting and construction administration for the fit-out of the school of medicine interim space in the B building of the Shadow Lane Campus
 
 
 
Date
Company Agency Name
Project
Preference
07/30/15
Cunningham Group Architecture, Inc.
Washoe County School District
Districtwide Rezoning

No
Description:  analysis and report regarding districtwide rezoning
 
 
 
Date
Company Agency Name
Project
Preference
06/23/15
KGA Architecture
City of Las Vegas, Nevada
Fire Training Center Rehabilitation

No
Description:  rehabilitation of the Fire Training Center at 633 N. Mojave Rd. in Las Vegas, Nevada
 
 
Date
Company Agency Name
Project
Preference
06/23/15
Pugsley, Simpson, Coulter Architects   
City of Las Vegas, Nevada
Doolittle Community Center Roof & HVAC

No
Description:  roof and HVAC work at the Doolittle Community Center at 1950 J St. in Las Vegas, Nevada
 
 
Date
Company Agency Name
Project
Preference
06/23/15
SH Architecture
City of Las Vegas, Nevada
Charleston Heights Community Center Renovation

No
Description:  renovation of the Charleston Heights Community Center at 800 Brush St. in Las Vegas, Nevada
 
 
Date
Company Agency Name
Project
Preference
06/23/15
Tate Snyder Kimsey Architects
City of Las Vegas, Nevada
Las Vegas Senior Center Rehabilitation

No
Description:  rehabilitation of the Las Vegas Senior Center at 451 E. Bonanza Rd. in Las Vegas, Nevada
 
 
Date
Company Agency Name
Project
Preference
06/23/15
Carpenter Sellers Del Gatto Architects
City of Las Vegas, Nevada
Medical District Bus Shelters

No
Description:  design of bus shelters to be located within Medical District in Las Vegas, Nevada
 
 
Date
Company Agency Name
Project
Preference
06/23/15
 LGA
 City of Las Vegas, Nevada
Baker Pool and Park Reconstruction

No
Description:  pool and park improvement at Baker Park located at 1100 E. St. Louis Ave. in the City of Las Vegas, Nevada
 
 
Date
Company Agency Name
Project
Preference
06/16/15
Hooft Architecture, LLC
Truckee Meadows Water Authority
Glendale WTP- Parking area, stairs, walkway and lighting

No
Description:  architectural services for stairs, walkway and lighting required due to the installation of additional parking area
 
 
Date
Company Agency Name
Project
Preference
04/15/15
GML Architects LLC
Washoe County School District
Nutrition Services

No
Description:  nutrition services- Master Plan Feasibility Study
 
 
Date
Company Agency Name
Project
Preference
04/02/15
The Dube Group
Washoe County School District
Door Hardware Replacement- Classroom Doors Only

No
Description:  professional engineering services for design of door hardware replacement - classroom doors only for Reed HS, Mathews ES, and Silver Lake ES
 
 
Date
Company Agency Name
Project
Preference
04/02/15
JR Romero Architect
Washoe County School District
Safety Related Projects

No
Description:  attic access for Allen ES, Beasley ES, Bennett ES, Brown ES, and Alice Smith ES
 
 
Date
Company Agency Name
Project
Preference
04/02/15
JR Romero Architect
Washoe County School District
Safety Related Projects

No
Description:  attic access and catwalk for Dilworth MS and Sparks MS
 
 
Date
Company Agency Name
Project
Preference
04/02/15
The Dube Group
Washoe County School District
Secure Perimeter Fencing

No
Description:  professional engineering services for design of secure perimeter fencing for Brown ES, Caughlin Ranch ES, and Diedrichsen ES
 
 
Date
Company Agency Name
Project
Preference
03/18/15
GML Architects LLC
Washoe County School District
Nutrition Services Freezer Expansion

No
Description: design freezer expansion for nutrition services
 
 
Date
Company Agency Name
Project
Preference
03/12/15
Pugsley Simpson Coulter Architects
Las Vegas Convention and Visitors Authority
Restroom Upgrade

No
Description: architectural and interior design of restroom upgrade
 
 
Date
Company Agency Name
Project
Preference
02/27/15
Hershenow & Klippenstein Architects, Inc.
Washoe County School District
Revitalization- Elementary Schools

No
Description: encumbrance of funds for contract dated 02/25/2015 for single point of entry & secure  perimeter and window replacement for Juniper ES and Towles - encumbrance of funds for contract dated 02/25/2015 for window replacement for Pleasant Valley ES, Gomm ES and Verdi ES
 
 
Date
Company Agency Name
Project
Preference
02/27/15
Hershenow & Klippenstein Architects, Inc.
Washoe County School District
Revitalization- Elementary Schools

No
Description: encumbrance of funds for contract dated 02/25/2015 for Revitalization of Juniper School - Phase II
 
 
Date
Company Agency Name
Project
Preference
02/27/15
Hershenow & Klippenstein Architects, Inc.
Washoe County School District
Revitalization- Elementary Schools

No
Description: encumbrance of funds for contract dated 02/25/2015 for Revitalization of Towles School - phase II
 
 
Date
Company Agency Name
Project
Preference
02/27/15
Hershenow & Klippenstein Architects, Inc.
Washoe County School District
Revitalization- Elementary Schools

No
Description: encumbrance of funds for contract dated 02/25/2015 for Revitalization of Pleasant Valley School - phase II
 

Date
Company Agency Name
Project
Preference
02/27/15
Hershenow & Klippenstein Architects, Inc.
Washoe County School District
Revitalization- Elementary Schools

No
Description: encumbrance of funds for contract dated 02/25/2015 for Revitalization of Gomm Schoo - phase II
 

Date
Company Agency Name
Project
Preference
02/27/15
Hershenow & Klippenstein Architects, Inc.
Washoe County School District
Revitalization- Elementary Schools

No
Description: encumbrance of funds for contract dated 02/25/2015 for revitalization of Verdi School- phase II
 

Date
Company Agency Name
Project
Preference
02/06/15
Architects + LLC
Washoe County School District
Window Replacement

No
Description: Washoe West HS - window replacement
 
 
Date
Company Agency Name
Project
Preference
01/23/15
J.R. Romero Architect
Washoe County School District
Carpentry-Misc. FCIS Repairs

No
Description: Traner MS - exterior soffit replacement-architectural Services and Hug HS - interior gym ceiling replacement- architectural services


Date
Company Agency Name
Project
Preference
01/09/15
H+K Architects
City of Sparks
Rock Park Restroom Project

No
Description: bring sewer and electric to the new bathroom location and building a new men and women's restroom with a storage area


Date
Company Agency Name
Project
Preference
01/09/15
GML Architects, LLC
Washoe County School District
ADA Restroom Upgrades

No
Description: phase 1. ADA Restroom Assessment and report to determine scope of ADA Restroom Upgrades at Billinghurst MS, Galnea HS, McQueen HS and Glenn Hare